Harbin Iron Tower Company installs intelligent relay power supply
time:2025-05-17 11:59:16

The Harbin Iron Tower is located far from the substation, with low voltage during peak hours and high voltage at midnight, causing equipment to malfunction.
After installing the intelligent relay power supply, the voltage value remained stable and the equipment could operate normally.

zv5r3rip3oa.jpg哈尔滨铁塔公司安装智能中继电源(图1)